top of page
LV Switchboard CT Metering & SiD Considerations
Wed, Feb 18
|Wellington
Join the Electrical Engineering Group for a presentation by Scott Caldwell, Bluecurrent’s Approved Test House (ATH) manager, for an introduction to LV Metering Requirements including Safety in Design (SiD) considerations.
Registration is closed
See other events

bottom of page